SELECTED
PROJECTS

San Francisco War Memorial
Opera House


The 1989 Loma Prieta earthquake caused major damage to the historic San Francisco War Memorial Opera House. The resulting seismic retrofit, which shut down the building for the 1996 season, provided an opportunity to bring the antiquated theatrical systems up to date. The theatre consulting firm of Auerbach + Associates, which oversaw the theatrical renovation of the Opera House, retained Ceitronics to install the audio-video systems.

A new infrastructure was developed that uses almost 100 miles of A/V wire and cable to distribute signals throughout the building. The circuits terminate in a new sound center that houses all signal processing equipment and is equipped with a control room where full production control is managed. The new digital sound control console provides great control flexibility and automated presetting of levels.

Back to top

Home Page | Corporate Profile | Areas of Service | Client List | Selected Projects | Employment Opportunities | Vendor Links | Contacting Us